Recommended Technologies
①
Start by selecting your product mix on the left. The matrix will update in real time as you apply each filter.
Select all product types in your operation
Required pieces per hour at peak
Always design to peak rate, not average. If you cannot confirm the peak from the customer, use 1.5x the stated average as your working number until it is confirmed in writing.
Space constraints and sort destinations
Sorter Arrangement
High destination counts favor loop sorters. If you are above 20 destinations and your floor allows it, a loop is almost always the right answer. Below 10, a line sorter is usually more cost effective.
Start by selecting your product mix on the left. The matrix will update in real time as you apply each filter.
| Sorter Technology | Type | PPH Range | Cost | Status | Reason |
|---|